MudCrafters ConstructionMudCrafters Construction

Poured Adobe Walls | Adobe Brick | Strawbale |
About Adobe floors | Basic Steps | Photo Gallery | Concrete Countertops | Custom Woodworking | Earthen Plasters | Clay Paints
About the Owners | Contact us |
subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link
subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link
subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link

Think you’re ready for MudCrafters?

Use this checklist regarding phases in your construction to gage when to schedule us in !

adobe floorscountertopscustom woodworkingearthen plastersclay finishesadobe brickstrawbale


ADOBE FLOORS:

This is one of the last finishes to your home, because of it’s length of time to complete and requirement for no other subcontractor's traffic on floor.

Initial ground-work to consider :

  • Moisture barriers in place
  • Radiant and in-floor heat systems in place and functioning properly (if applicable)
  • Rough-in electrical and plumbing completed
  • Elevations for stairs windows, doors, counters must account for floor thickness

Have you:

  • Installed functioning heated floor tubing?
  • Finished the walls / ceilings surfaces?

COUNTERTOPS:

Have you:

  • Installed the cabinets
  • Sealed faces of cabinets
  • Roughed-in plumbing to cabinets and functioning outlets
  • Roughed-in lighting fixtures above
  • Aquired sinks and fixtures (and on jobsite)
  • Chosen desired shape, thickness and colors

Before you:

  • Finish interior wall surfaces

CUSTOM WOODWORKING:

Please call for job-specific time-scheduling


EARTHEN PLASTERS:

Have you:

  • Installed and sealed windows
  • Rough-in Electrical and Plumbing
  • Drywall
  • Installed exterior and int. doors
  • Installed and sealed window/doors seals
  • Bullnoses, Reveals, and Texture defined
  • Taped and Mudded Drywall
  • Cobbed and Wired Strawbale

Before you:

  • Mount Plumbing and Electrical fixtures

CLAY FINISHES:

Have you:

  • Plastered wall surfaces with smooth or sponged or knowndown-trowel finish
  • Chosen color and effects for clay (mica, straw, modeling, etc)
  • Masked any surfaces that need to be protected
  • Sealed any ajoining woodwork

Before you:

  • Installed outlet plates

ADOBE BRICK

Have you:

  • Accounted for the weight of adobe in foundation, ajoining wall system

Please Consider:

  • Weight
  • Adjoining and connecting to what surface (plasters, woodwork, tile, concrete, adobe floors)
  • Be aware of it’s lengthy drying time
  • Chosen what shape and for what function
  • Benches, nichos, kivas, partitioned walls, arches, scuplture and reliefs
  • Proper roofing structure to preserve bricks
  • Adequate water shedding /drainage

STRAWBALE:

Please Consider:

  • Thicker walls
  • Dimensions of strawbale
  • Heighth of walls
  • Post/beam or weight bearing
  • Foundation Moisture protection
  • Installing Window and door bucks
  • Electrical planning and incorperation into bales

Think you’re ready for MudCrafters?  SiteMap  ©2007 MudCrafters Construction